BELGRADE GETS A NEW BRIDGE: New competition announced for the bridge at Ada Huja

According to the project elaborated by Faculty of Civil Engineering, four bridge structures are predicted with the main span width of 200 meters, while the total length with approach structures totaled 3,350 meters

Belgrade Land Development Public Agency has announced the tender for the preliminary design and feasibility study for a new bridge on the Danube near Ada Huja.

The new bridge is scheduled within the outer main roads tangent (SMT), which should connect Pancevo road and highway E75.

According to the project elaborated by Faculty of Civil Engineering, four bridge structures are predicted with the main span width of 200 meters, while the total length with approach structures totaled 3,350 meters.

The deadline for execution of the service is 380 calendar days, and interested parties can submit bids up to 3 October.

(Telegraf.co.uk / N1)